The Installation of the Shaker Screen

Posted by:    Time:2014-05-27     click:

Description: The shaker screen is used in oil de3velopment to filter the impurity. However, we have no idea about how to install shaker screen properly.

The shaker screen has various classification and different structure. Therefore, it is necessary for users to carry out reasonable installation, usage as well as maintenance for users. Therefore, how to install shaker screen is crucial. And the shaker is famous for shaker screen. Before installing, it is necessary to check carefully. Doe to having been store for such a long time, so it is to check the bearings, sealing parts as well as any damage. It is necessary to change the damaged components in time. Before installing, it is possible to prepare well.

As for how to install shaker screen, in the middle of installing, it is necessary to install the bearings and suspension device first of all. And during the whole operation process, it is necessary to level the foundation of the shaker screen. And then install the shaker screen according to components diagram of bearings and suspension devices. And remember to install the shaker screen in proper order. And then connect screen tank to bearings and suspension devices. And after installation, adjust the angle according to regulations.

And as for suspension screen, how to install shaker screen ? It is necessary to adjust in a horizontal way to eliminate the incline of the screen tank. After horizontal adjustment, it is possible to carry out longitudinal adjustment. And the pressure of the isolation spring should be uniform. And the press condition should be judged according to measured compression of the spring. Generally, the compression should be equal of two units springs of the feeding ends.

In addition, test run is also one factor of how to install shaker screen. After installing the screen, it is possible to carry out test run without load. And the running hour of the test run should be less than 8 hours. During this period, it is necessary to observe whether the shaker run smoothly. And during the operation of the screen, there should be no sway in straining box vibration.

After the problem of how to install shaker screen, it is necessary to pay attention to the operation of the shaker screen. First of all, the operators should check the shaker screen carefully each shift. And remember to check whether there is damage on any components. And before running, it is necessary to observe the working condition of the shaker screen.

And the maintenance is also one important part of how to install shaker screen. The maintenance of the shaker screen is to comprehend the condition of the shaker screen on the whole. And it is necessary to know the damaged components and parts in time. And the maintenance of the shaker screen includes daily maintenance, regular check as well as maintenance.